Modelling and optimization of a natural gas supply system at a transient stage: a case study of China

Abstract

The global energy structure is on a low-carbon transition path featuring more natural gas consumption, and global natural gas demand has been increasing fast. Planning and operation of a natural gas supply system at a transient stage with multiple supply sources, end-consumers, and large infrastructure with multiple sub-systems are challenging tasks. Spatial and seasonal mismatch of natural gas supply and demand makes the natural gas distribution and infrastructure construction planning problem even more complex. Without proper planning, insufficient construction could lead to a shortage of natural gas supply, whilst excessive construction could lead to a higher cost. Quantitative analysis technologies are needed to facilitate decision-making during the transient stage of a natural gas system. In this work, we propose a monthly-scale multi-period and multi-regional modelling and optimization framework for planning and operation of a natural gas supply system at a transient stage, with a case study of the natural gas supply system in China. The optimal planning and operation strategy of the natural gas supply system in China by 2050 is obtained by minimizing the lifespan overall cost. Gaps between actual planning and the optimal planning are pointed out. Finally, policy suggestions are summarized, including establishing market-oriented pricing mechanisms, managing infrastructure centrally, promoting coordination amongst provinces when formulating projections, accelerating current infrastructure construction, and predicting natural gas demand and prices reasonably.

Background

In recent years, global natural gas consumption has grown rapidly, and the share of natural gas in primary energy consumption has reached a historical high level of 23.4%. In 2017, global natural gas consumption increased by 3 %, higher than the overall energy consumption growth rate of 2.2%. The increase is mainly from China, the Middle East and Europe, accounting for 15.1, 13.6, and 12.7%, respectively [1].

Natural gas supply highly depends on specialized and high-cost infrastructure, including pipeline networks, liquid natural gas (LNG) ports, and storage facilities. Spatial mismatch between natural gas resources and natural gas demand requires a large amount of infrastructure. In 2017, international natural gas trade reached 1134 billion cubic meters (bcm), accounting for 31% of global natural gas consumption, of which 740.7 and 393.4 bcm were transmitted through pipelines and LNG ports, respectively [1].

The rapid growth of natural gas consumption is the inherent demand and external performance of low carbon transition. The low carbon transition requires more natural gas infrastructure, and infrastructure costs are a major part of the cost of natural gas supply systems. If infrastructure costs are too high, the low-carbon transition would slow down, break off or even reverse. Therefore, developing an appropriate planning framework to obtain the optimal planning, which is a timetable of the infrastructure expansion, by minimizing the overall cost would facilitate the transition.

Modelling and optimization of a natural gas supply system at a transient stage is a challenging work. The variety of space and time would greatly increase the uncertainty of a system, including multiple supply sources, end-users, subsystems, transmission and processing technologies. In addition, economic performance of technologies should also be considered.

Modelling and optimization of an energy supply system to solve spatial mismatch of energy supply and demand have been studied in many researches. A spatial heating model in Denmark was established to compare the energy supply cost between individual natural gas supply and district heating supply [2]. A spatial model with multiple energy supply and end-use technologies in UK was developed aiming at identifying a low-carbon transition pathway [3]. Shan et al. [4] assessed the reliability of a heating system by developing a heating distribution network model. Geothermal energy resource, georeferenced data of buildings and road networks were integrated into a district heating model, and optimal infrastructure construction plan was obtained by minimizing the construction cost [5]. Pan et al. [6] established a dynamic model of China’s oil supply chain and simulated oil distribution to evaluate the energy security. Geographic Information System was applied to develop an urban energy system model and plan sustainable energy systems in cities [7]. Spatially modelling were widely applied in other energy systems, including power grid [8], power generation capacity [9] and considering carbon policy [10], distributed energy systems [11], bioenergy [12] and hydrogen [13].

Spatial modelling is also applied in researches on natural gas supply systems. Roger [14] reviewed and summarized modelling methods of natural gas pipeline components and optimization researches on natural gas gathering, transmission and distribution models. Dejan [15] developed a spatial natural gas distribution networks model based on improved Hardy Cross method [16]. Halit [17] established a nonlinear optimization model to obtain the optimal construction plan by minimizing investment and operation costs. Dieckhoner et al. [18] and Chaudry et al. [19] developed a pipeline network model and obtained an expansion plan to address increasing demand of natural gas based on existing infrastructure. An interconnected natural gas and electrical transmission model was developed for the natural gas system in Illinois, considering spatiotemporal changes in energy demand [20]. The supply reliability of pipeline networks was defined and assessed based on the infrastructure modelling [21], and applied in city [22] and country [23] level. Zhang et al. [24] established a multi-regional natural gas distribution model of China, and optimized gas flow and infrastructure deployment by minimizing the total supply cost.

However, previous studies focus mainly on spatial scales, whilst large disparities over space and time are still not well studied in natural gas supply systems, especially in a transient stage. Besides spatial mismatch, hourly, monthly and yearly changes on both supply and demand sides make the energy supply even more challenging. Yearly natural gas demand increases fast. Monthly demand fluctuates greatly because of significant heating demand in cold months, which is usually neglected in existing studies. Natural gas storage facilities play an important role to deal with seasonal fluctuations. Therefore, a natural gas supply system can be extremely complex in a large area and during a long period, because of spatial and seasonal mismatches between supply and demand.

The aforementioned problems with planning of a natural gas system are happening in China, and they could become increasingly more severe if not properly addressed. China is a large natural gas consumer, accounting for 5.9% of the world’s natural gas consumption [25]. Natural gas has been identified as a transition energy from fossil fuels to renewable energy in China [26]. Natural gas consumption has increased by 57% from 2012 to 2017 [27]. In 2017, China’s natural gas consumption exceeded 237 bcm, ranking the third in with world [28].

China’s natural gas demand is projected to keep the fast increasing momentum in the future. According to the 13th-five-year plan in China, natural gas demand is projected to further increase and account for 10 % of total energy demand by 2020 [29]. Many studies have also attempted to predict future China’s natural gas demand. Li et al. [30] developed a system dynamics model to forecast natural demand in China. Self-adapting Grey models [31], nonlinear Grey models [32] and Bayesian Model Averaging [33] were also applied to forecast natural gas demand. Shaikh and Ji [34] compared forecast results of different studies, and most researches indicated that China’s natural gas demand would vary between 350 and 400 bcm by 2020.

The spatial mismatch of natural gas production and demand are significant in China [27], as shown in Figs. 1 and 2. A large number of cross-provincial pipeline networks and import facilities have been constructed and operated by three firms, namely Sinopec [35], CNPC [36] and CNOOC [37], as shown in Fig. 3. In the meanwhile, nation-wide seasonal fluctuations of natural gas demand are significant. Seasonal fluctuations in different regions are rather different, which make the management of China’s natural gas supply system more complicated.

Fig. 1
figure 1

Natural gas production by province in 2016

Fig. 2
figure 2

Natural gas consumption by province in 2016

Fig. 3
figure 3

China’s cross-provincial natural gas pipeline network and LNG port in 2017

In this paper, a monthly-scale multi-period and multi-regional modelling and optimization framework of a natural gas supply system at a transient stage is proposed. The natural gas supply system in China is applied as a case study, which exhibits the aforementioned features of complexity in terms of its rapid increase in demand, rapid construction of infrastructure, and large disparities over space and time. The optimal distribution strategy and the optimal infrastructure planning by 2050 is obtained by minimizing the overall cost.

The space and time scale of modelling research is improved in this study, which describes natural gas transmission among 30 regions, balance of supply and demand in each month, and infrastructure expansion in a long period.

This paper is organized as follows. In Section two, the methodology is illustrated. In Section three, China’s natural gas supply system is introduced as a case study. In Section four, results are analyzed, and policy suggestions are discussed. In Section five, main conclusions are summarized.

Methods

Generic framework of natural gas supply systems

A generic framework of natural gas supply systems with multi-regions and multi-periods comprises five parts, namely domestic production, import, transmission, storage and demand part, as shown in Fig. 4.

Fig. 4
figure 4

Framework of a natural gas supply system

In the domestic production part, natural gas resources and production capacity are different regionally. Similarly, the import capacity is different regionally depending on the import infrastructure, including pipelines and LNG ports. Natural gas transmission has four options, namely pipelines, LNG ports, trucks and no transmission. The transmission cost is different using these technologies. The storage capacity, depending on storage facilities, serves the purpose of managing monthly fluctuations of natural gas demand and holding safety threshold above a certain level to deal with unexpected and unpredictable risks. In the demand section, yearly natural gas demand and monthly fluctuations are different regionally.

Mathematical model

The Mix Integer Programming (MIP) method is applied to represent a natural gas supply system. Generic expression of a MIP problem is shown in Eq. 1, where x, d, y, θ represents a vector of continuous operational variables, continuous design variables, binary design variables and input parameters respectively. Function f, h, g represents objective function, equality and inequality constraints respectively.

$$ {\displaystyle \begin{array}{c}\boldsymbol{\min}\ \boldsymbol{f}\left(\boldsymbol{x},\boldsymbol{d},\boldsymbol{y},\boldsymbol{\theta} \right)\\ {}\boldsymbol{s}.\boldsymbol{t}.\kern0.5em \boldsymbol{h}\left(\boldsymbol{x},\boldsymbol{d},\boldsymbol{\theta} \right)=\mathbf{0},\\ {}\ \boldsymbol{g}\left(\boldsymbol{x},\boldsymbol{d},\boldsymbol{y},\boldsymbol{\theta} \right)\le \mathbf{0}\end{array}} $$
(1)

In this model, monthly natural gas production, import, transmission and storage in each region are operational variables. Expansions of natural gas pipelines, ports and storage facilities year by year are design variables. Resources, geographic location, costs, prices, monthly demand, yearly production capacity and natural gas infrastructure in the base year are input parameters.

Balance between supply and demand in each region, storage balance amongst periods, and infrastructure development year by year mainly make up equality constrains. Inequality constraints generally result from resources, infrastructure limitation and geographic restrictions. The objective function is the overall cost of a natural gas supply system in a long period. Those variables can be obtained by minimizing the objective function.

The detailed is showed below. The following Eq. 2–22 make up a MIP problem. The MIP problem is solved on the platform of General Algebraic Modeling System (GAMS) [38]. The CPLEX solver is used to solve the problem. The notation is listed in the Abbreviations Part.

Domestic production and import

Domestic production and net import make up total natural gas supply. The model assumes insufficient domestic natural gas production and sufficient international natural gas supply. Therefore, monthly and overall natural gas production, marked as pror,t,m and pror, t, are constrained by production capacity PRmax,r,t and resources REr, where r,t,m represent region, year and month respectively, as shown in Eqs. 2 and 3. Natural gas import ir,t,m is constrained by import capacity Imax,r,t, as shown in Eq. 4. Considering that natural gas production is relatively stable, a parameter A is set to represent the maximum gap between natural gas production and monthly average production, as shown in Eq. 5.

$$ \sum \limits_{\boldsymbol{m}}{\boldsymbol{pro}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\le {\boldsymbol{PR}}_{\boldsymbol{\max},\boldsymbol{r},\boldsymbol{t}} $$
(2)
$$ \sum \limits_{\boldsymbol{t}}{\boldsymbol{pro}}_{\boldsymbol{r},\boldsymbol{t}}\le {\boldsymbol{RE}}_{\boldsymbol{r}} $$
(3)
$$ {\boldsymbol{i}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\le {\boldsymbol{I}}_{\boldsymbol{\max},\boldsymbol{r},\boldsymbol{t}}/\mathbf{12} $$
(4)
$$ \left(\sum \limits_{\boldsymbol{m}}{\boldsymbol{pro}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}/\mathbf{12}\right)\times \left(\mathbf{1}-\boldsymbol{A}\right)\le {\boldsymbol{pro}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\le \left(\sum \limits_{\boldsymbol{m}}{\boldsymbol{pro}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}/\mathbf{12}\right)\times \left(\mathbf{1}+\boldsymbol{A}\right) $$
(5)

Transmission

Natural gas transmission greatly relies on the specialized infrastructure. Pipeline networks are main methods to transmit natural gas in a long distance. In this model, only transmission amongst regions are considered, whilst transmission within a region is neglected. Due to the fact that the amount of natural gas transmitted via other means, truck for instance, is negligible compared with pipeline transmission, other transmission ways are neglected in this study.

Natural gas can only be transmitted between two adjacent regions, and the transmission quantity tr,rr,t,m cannot exceed the upper bound constrained by infrastructure Tmax,r,rr,t, as shown in Eq. 6. A binary variable ytr,rr is introduced to represent geographic constraints, where ytr,rr equals to zero representing two regions are not adjacent, as shown in Eq. 7.

$$ {\boldsymbol{t}}_{\boldsymbol{r},\boldsymbol{r}\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\le {\boldsymbol{T}}_{\boldsymbol{\max},\boldsymbol{r},\boldsymbol{r}\boldsymbol{r},\boldsymbol{t}}/\mathbf{12} $$
(6)
$$ {\displaystyle \begin{array}{c}-{\boldsymbol{L}}_{\mathbf{1}}\times {\boldsymbol{yt}}_{\boldsymbol{r},\boldsymbol{rr}}\le {\boldsymbol{t}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{m}}\le {\boldsymbol{L}}_{\mathbf{1}}\times {\boldsymbol{yt}}_{\boldsymbol{r},\boldsymbol{rr}}\\ {}\left({\boldsymbol{yt}}_{\boldsymbol{r},\boldsymbol{rr}}-\mathbf{1}\right)\times {\boldsymbol{L}}_{\mathbf{1}}\le {\boldsymbol{t}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{m}}\end{array}} $$
(7)

Storage

Natural gas storage facilities play an important role in meeting peak demand. Natural gas storage is constrained with capacity and period, where storage quantity sr,t,m cannot exceed its maximum capacity Smax,r,t, as shown in Eq. 8, and ending stock of this period s1r,t,m − 1, equals the beginning of the next period s0r,t,m, as shown in Eq. 9.

$$ {\boldsymbol{s}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\le {\boldsymbol{S}}_{\boldsymbol{\max},\boldsymbol{r},\boldsymbol{t}} $$
(8)
$$ \boldsymbol{s}{\mathbf{0}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}=\boldsymbol{s}{\mathbf{1}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}-\mathbf{1}} $$
(9)

Balance of supply and demand

This work takes a monthly scale to reflect seasonal fluctuations of natural gas demand. In each region and in each month, total supply equals total demand. Total supply comprises of domestic production, net import, net transmission from other regions and net storage reduction, as shown in Eq. 10.

$$ {\boldsymbol{D}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}={\boldsymbol{pro}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}+{\boldsymbol{i}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}+\sum \limits_{\boldsymbol{r}\boldsymbol{r}}\left({\boldsymbol{t}}_{\boldsymbol{r}\boldsymbol{r},\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}-{\boldsymbol{t}}_{\boldsymbol{r},\boldsymbol{r}\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\right)-{\boldsymbol{e}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}+\boldsymbol{s}{\mathbf{0}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}-\boldsymbol{s}{\mathbf{1}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}} $$
(10)

Monthly natural gas demand in all regions are input parameters in this model. Monthly fluctuations of demand are different in end-users, namely heating, power generation and other industry demand. Regional fluctuations can be obtained according to the proportion of natural gas demand in end-users.

Infrastructure expansion

Along with the increase of the natural gas demand, more pipelines, LNG ports and storage facilities would be constructed. The increasing infrastructure would promote the supply capacity of natural gas. Expansions of natural gas storage facilities are continuous design variables, shown in Eq. 11, whilst expansions of pipelines and ports are discontinuous variables. The new capacity is an integer multiple of the standard capacity, marked as NT0 and NI0. Binary design variables yntr, rr,t,i,ynir,t,i are applied to describe it, as shown in Eqs. 12 and 13.

The infrastructure expansion also has geographical constraints. New pipelines can only be constructed between two adjacent regions, and new LNG ports can only be constructed in coastal regions. A binary variable yir is introduced to represent whether a region is coastal or not, as shown in Eqs. 14 and 15.

$$ {\boldsymbol{S}}_{\boldsymbol{\max},\boldsymbol{r},\boldsymbol{t}}={\boldsymbol{S}}_{\boldsymbol{\max},\boldsymbol{r},\boldsymbol{t}\mathbf{0}}+\sum \limits_{\boldsymbol{t}={\boldsymbol{t}}_{\mathbf{0}}}^{\boldsymbol{t}}{\boldsymbol{NS}}_{\boldsymbol{r},\boldsymbol{t}} $$
(11)
$$ {\boldsymbol{t}}_{\boldsymbol{r},\boldsymbol{r}\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\le \left({\boldsymbol{T}}_{\boldsymbol{\max},\boldsymbol{r},\boldsymbol{r}\boldsymbol{r},\boldsymbol{t}\mathbf{0}}+\sum \limits_{\boldsymbol{t}={\boldsymbol{t}}_{\mathbf{0}}}^{\boldsymbol{t}}\sum \limits_{\boldsymbol{i}=\mathbf{1}}^{\mathbf{5}}{\boldsymbol{NT}}_{\mathbf{0}}\times \left({\boldsymbol{ynt}}_{\boldsymbol{r},\boldsymbol{r}\boldsymbol{r},\boldsymbol{t},\boldsymbol{i}}\times {\mathbf{2}}^{\boldsymbol{i}-\mathbf{1}}\right)\right)/\mathbf{12} $$
(12)
$$ {\boldsymbol{i}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\le \left({\boldsymbol{I}}_{\boldsymbol{\max},\boldsymbol{r},\boldsymbol{t}\mathbf{0}}+\sum \limits_{\boldsymbol{t}={\boldsymbol{t}}_{\mathbf{0}}}^{\boldsymbol{t}}\sum \limits_{\boldsymbol{i}=\mathbf{1}}^{\mathbf{5}}{\boldsymbol{NT}}_{\mathbf{0}}\times \left({\boldsymbol{yni}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{i}}\times {\mathbf{2}}^{\boldsymbol{i}-\mathbf{1}}\right)\right)/\mathbf{12} $$
(13)
$$ {\displaystyle \begin{array}{c}-{\boldsymbol{L}}_{\mathbf{2}}\times {\boldsymbol{yt}}_{\boldsymbol{r},\boldsymbol{rr}}\le \sum \limits_{\boldsymbol{i}=\mathbf{1}}^{\mathbf{5}}{\boldsymbol{NT}}_{\mathbf{0}}\times \left({\boldsymbol{ynt}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{i}}\times {\mathbf{2}}^{\boldsymbol{i}-\mathbf{1}}\right)\le {\boldsymbol{L}}_{\mathbf{2}}\times {\boldsymbol{yt}}_{\boldsymbol{r},\boldsymbol{rr}}\\ {}\left({\boldsymbol{yt}}_{\boldsymbol{r},\boldsymbol{rr}}-\mathbf{1}\right)\times {\boldsymbol{L}}_{\mathbf{2}}\le \sum \limits_{\boldsymbol{i}=\mathbf{1}}^{\mathbf{5}}{\boldsymbol{NT}}_{\mathbf{0}}\times \left({\boldsymbol{ynt}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{i}}\times {\mathbf{2}}^{\boldsymbol{i}-\mathbf{1}}\right)\end{array}} $$
(14)
$$ {\displaystyle \begin{array}{c}-{\boldsymbol{L}}_{\mathbf{3}}\times {\boldsymbol{yi}}_{\boldsymbol{r}}\le \sum \limits_{\boldsymbol{i}=\mathbf{1}}^{\mathbf{5}}{\boldsymbol{NI}}_{\mathbf{0}}\times \left({\boldsymbol{yni}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{i}}\times {\mathbf{2}}^{\boldsymbol{i}-\mathbf{1}}\right)\le {\boldsymbol{L}}_{\mathbf{3}}\times {\boldsymbol{yi}}_{\boldsymbol{r}}\\ {}\left({\boldsymbol{yi}}_{\boldsymbol{r}}-\mathbf{1}\right)\times {\boldsymbol{L}}_{\mathbf{3}}\le \sum \limits_{\boldsymbol{i}=\mathbf{1}}^{\mathbf{5}}{\boldsymbol{NI}}_{\mathbf{0}}\times \left({\boldsymbol{yni}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{i}}\times {\mathbf{2}}^{\boldsymbol{i}-\mathbf{1}}\right)\end{array}} $$
(15)

Objective function

The optimization objective is the overall supply cost of a natural gas supply system at a transient period. The overall cost is aggregated from annual costs using a discount rate, as shown in Eq. 16. Annual costs comprise of domestic production costs, import costs, transmission costs, storage costs, and infrastructure construction costs, as shown in Eq. 17.

Domestic production costs are calculated by multiplying the wellhead price by the natural gas output, as shown in Eq. 18. Import costs consist of import prices, tax and gasification costs, as shown in Eq. 19. Equation 20 shows that transmission costs equal to transmission prices multiplied by transmission quantity. Storage costs are regarded as depreciation, which equals to the value of storage quantity multiplied by the discount rate, as shown in Eq. 21. Equation 22 shows the infrastructure expansion costs.

$$ \boldsymbol{c}=\sum \limits_{\boldsymbol{t}}{\boldsymbol{c}}_{\boldsymbol{t}}\ast {\left(\mathbf{1}-\boldsymbol{DR}\right)}^{\boldsymbol{t}-\mathbf{1}} $$
(16)
$$ {\boldsymbol{c}}_{\boldsymbol{t}}=\sum \limits_{\boldsymbol{r},\boldsymbol{m}}\left({\boldsymbol{c}\boldsymbol{p}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}+{\boldsymbol{c}\boldsymbol{i}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}+\sum \limits_{\boldsymbol{r}\boldsymbol{r}}{\boldsymbol{c}\boldsymbol{t}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{m}}+{\boldsymbol{c}\boldsymbol{s}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\right)+\sum \limits_{\boldsymbol{r}}{\boldsymbol{c}\boldsymbol{c}}_{\boldsymbol{t}} $$
(17)
$$ {\boldsymbol{cp}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}={\boldsymbol{PP}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\ast {\boldsymbol{pro}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}} $$
(18)
$$ {\boldsymbol{ci}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}={\boldsymbol{i}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\ast \left({\boldsymbol{PI}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}+{\boldsymbol{PG}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\right)\ast \left(\mathbf{1}+\boldsymbol{Tax}\right) $$
(19)
$$ {\boldsymbol{ct}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{m}}={\boldsymbol{t}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{m}}\ast {\boldsymbol{PT}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{m}} $$
(20)
$$ {\boldsymbol{cs}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{m}}=\boldsymbol{s}{\mathbf{1}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\ast {\boldsymbol{P}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{m}}\ast \boldsymbol{DR}/\mathbf{12} $$
(21)
$$ {\boldsymbol{cc}}_{\boldsymbol{t}}={\boldsymbol{NS}}_{\boldsymbol{r},\boldsymbol{t}}\times {\boldsymbol{PNS}}_{\boldsymbol{t}}+{\boldsymbol{NI}}_{\mathbf{0}}\times \left({\boldsymbol{yni}}_{\boldsymbol{r},\boldsymbol{t},\boldsymbol{i}}\times {\mathbf{2}}^{\boldsymbol{i}-\mathbf{1}}\right)\times {\boldsymbol{PNI}}_{\boldsymbol{r},\boldsymbol{t}}+{\boldsymbol{NT}}_{\mathbf{0}}\times \left({\boldsymbol{ynt}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t},\boldsymbol{i}}\times {\mathbf{2}}^{\boldsymbol{i}-\mathbf{1}}\right)\times {\boldsymbol{PNT}}_{\boldsymbol{r},\boldsymbol{rr},\boldsymbol{t}} $$
(22)

In this work, the objective function only considers the costs in supply chains. It is expected to reflect the result of market competition considering policy situation, where China’s natural gas market is reforming in a more competitive direction, with more suppliers and centralized management of pipelines. The lowest cost in supply chains is equivalent to the market equilibrium state. Otherwise, if there is a strategy that makes the cost lower, then there must be players in the market who adopt this strategy to gain benefits by reducing the cost. Social costs and the cost associated with shortage of supply exist indeed, but they are not reflected in current market mechanisms, which means the cost would not affect the NG transportation. Therefore, only the costs in supply chains are considered to reflect the result of market competition.

Uncertainty analysis

This model is developed to find out the optimal infrastructure expansion plan and natural gas distribution strategy by minimizing the overall cost. Because of that, main uncertainties of the model derive from the gap between demand and supply, costs in the supply chain, and the discount rate. In this study, this methodology is applied in China’s natural gas supply system, where domestic natural gas is insufficient and has lower prices than import natural gas. Therefore, demand forecast, transmission cost, import cost and the discount rate are main parameters that would affect the result greatly.

The uncertainty analysis of the model is performed by increasing or decreasing these main parameters by 5%. Some indicators are selected to show the impact on the results, which are the overall cost, cumulative investment on pipelines, cumulative new LNG import capacity, and cumulative storage capacity. These four indicators reflect the impact on the overall cost, pipeline expansion plan, LNG port expansion plan and storage capacity expansion plan. The result is listed in Table 1.

Table 1 results of the uncertainty analysis

Results show that demand forecast has more impacts than the other parameters. Higher demand forecast would lead to further infrastructure expansion and more natural gas transmission.

Case study

The methodology developed above is applied to model and optimize the natural gas supply system in China.

Regions and periods set

There are 30 regions in the model representing 30 out of the total 34 provinces of China, as shown in Fig. 5, where Hong Kong, Macao, Taiwan and Tibet are not included due to data availability issues. The time resolution is at a monthly scale. The planning period is from 2015 to 2050.

Fig. 5
figure 5

Regions set in the model

China’s natural gas supply system

The natural gas supply system in this model consists of import facilities, cross-provincial transmission pipelines and storage facilities, whilst transmission pipelines inside a province are neglected.

Import facilities

China’s natural gas import has been increasing fast in recent years, and the external dependent degree has exceed 40%. Natural gas import facilities in China comprise of pipelines and LNG ports.

Import pipeline facilities locate in Northwest and Southwest China, importing natural gas from Central Asia and Myanmar, respectively. Import facilities from Central Asia consist of three pipelines with a total import capability of 55 bcm as of the end of 2017, importing natural gas from Turkmenistan, Uzbekistan, and Kazakhstan. Another pipeline importing natural gas from Russia is under construction and is expected to be in operation in 2020. The fourth pipeline from Central Asia is listed in 13th-five-year plan and expected to be completed before 2020. Details are shown in Additional file 1.

LNG ports locate in all coastal provinces in China, and the annual import capability has reached 75 bcm by the end of 2017. Details are shown in Additional file 2.

Cross-provincial natural gas pipelines in China

The spatial mismatch of natural gas supply and demand in China requires complex pipeline networks, especially high-pressure cross-provincial pipelines. Total mileage of cross-provincial natural gas pipelines in China has reached 64,000 km in 2015, and it is expected to exceed 104,000 km in 2020 [29]. Details of pipelines are shown in Additional file 3.

Natural gas storage facilities in China

The storage capability in operation only accounts for 3 % of total natural gas consumption in China, which means the peaking capability is insufficient and the temporal fluctuations of demand have a significant impact on operation of the pipeline system. Underground gas storage is the main storage facilities, located in eight provinces of China. Total storage capability in operation is 7 bcm by the year of 2017. Details are shown in Additional file 4.

Current policies on natural gas transmission and pricing

The long-distance natural gas transmission in China is now mainly operated by three companies mentioned before. The transmission fee of each pipeline is fixed, which is audited, regulated and disclosed by the central government.

The natural gas pricing mechanism is half market-oriented depending on the natural gas resource. The pricing of LNG is fully market-oriented, and the pricing of natural gas transmitted by pipelines is mainly government-oriented. A series of urban gate station prices transmitted by pipelines in each provinces are set by central government, and the prices could float up a certain percent during high demand seasons.

Data

In this study, future natural gas production capacity is estimated according to the China’s 13th-five-year energy plan. Future demand set mainly comes from the China’s 13th-five-year energy plan with modifications according to other researches mentioned before.

The import, transmission, storage capacity and transmission prices are gathered from three national oil and natural gas companies, China National Petroleum Corp (CNPC) [36], China Petroleum & Chemical Corporation (Sinopec) [35] and China National Offshore Oil Corporation (CNOOC) [37]. The historical production and demand in each province are obtained from China Energy Statistical Yearbook [27]. The well prices and sale prices of natural gas are gathered from National Development and Reform Commission, as shown in Additional file 5.

Scenarios settings

Three groups of scenarios are set for comparison purposes, namely historical scenarios, short-term scenarios and long-term scenarios.

Historical scenarios

Historical scenarios include the simulation scenario and the optimization scenario with the purpose of indicating the difference between actual and the optimal strategies from 2015 to 2017. In the simulation scenario, actual historical data are collected and put into the model, including provincial and monthly production, import and consumption data. Simulation results can show the operation status of the supply system. In the optimization scenario, the total supply cost is minimized to obtain the optimal natural gas distribution strategy. The optimal strategy would indicate the optimal selection of locations and quantities for natural gas import and also how to distribute natural gas to all regions.

Short-term scenarios

Short-term scenarios use the China’s infrastructure formulation as input to optimize the operation of the natural gas supply system under different demand forecasts up to 2020. Short-term scenarios are designed to study whether existing infrastructure plans match natural gas demand expectations.

The natural gas demand forecast in short-term scenarios are generated based on projections of China and each province. It should be pointed out that there is a gap between the China’s projection to the overall natural gas demand in 2020 and the summation of projections of all provinces, 370 bcm and 408 bcm, respectively. In our study, we take an average projection of 385 bcm as the basic scenario modified from province projections, as shown in Table 2.

Table 2 Natural gas demand in each province (bcm)

The basic short-term scenario with a 385 bcm demand forecast is marked as S385. Three comparison scenarios with different demand forecasts are set to indicate the impact on operation strategy, as shown in Table 3. Then the optimal operation strategy of China’s natural gas system can be obtained by minimizing the total supply cost.

Table 3 National natural gas forecasts in short-term scenarios (bcm)

Long-term scenarios

Long-term scenarios are set to obtain the optimal planning of infrastructure expansions as well as natural gas distribution strategies from 2015 to 2050.

According to the uncertainty analysis, demand forecast has great effects on the result. In this case study, natural gas transmission cost is regulated by the government, and it is considered constant for a long time. Therefore, scenarios are set, marked as L1–4, based on different demand forecast in long-term scenarios, as shown in Table 4.

Table 4 National natural gas forecasts in long-term scenarios (bcm)

Natural gas demand forecast in basic scenario L3 is set according to China’s projection that natural gas demand accounts for 15% in 2030. The demand in 2030 is estimated to be around 750 bcm. The provincial demand decomposition is shown in Table 2.

Results

Simulation of the natural gas shortage in 2017

In the historical simulation scenario, results present operation status of China’s natural gas supply system from 2015 to 2017. Figure 6 shows the usage rate of natural gas infrastructure in Dec 2017, when a natural gas shortage occurred in China. It indicates that the infrastructure utilization reaches its upper bound in North China. All LNG ports are running at the highest load or even overloaded.

Fig. 6
figure 6

Usage rate of pipelines and ports in Dec 2017

Optimal natural gas distribution strategy

In the historical optimization scenario, the optimal strategy of natural gas distribution can be summarized by comparing results with the historical simulation scenario.

The optimal strategy can be summarized as the shortest distance transmission. In warm days, from April to October, natural gas produced in West China and imported from Central Asia need to meet the demand in North and East China, and LNG need to be imported only in South China. In cold days, from November to next March, LNG need to be imported not only in South China but in North China due to great heating demand.

The actual distribution strategy and the optimal strategy are different to some extent. Results from the simulation scenario indicate that, in warm days, LNG is imported in North China, and natural gas from Central Asia is transmitted to South China. That would increase the supply cost in North China and decrease the supply cost in South China, whilst the total supply cost is higher.

The total supply cost can be lower by taking the optimal strategy, whilst the potential cost reduction space is limited, because the infrastructure utilization is close to the upper bound. Only 10 billion yuan of the import cost and 7 billion yuan of the transmission cost can be saved by taking the optimal strategy in 2017, whilst the annual supply cost reaches 391 billion yuan. The production, transmission and import cost account for 38, 15 and 47% respectively, whilst the storage cost accounts for less than 1 %. It indicates that if international natural gas prices rise by 1%, the total supply cost in China would rise by 0.47%.

Mismatch between demand projections and infrastructure planning

In short-term scenarios, if the optimal solution exists, it will indicate the infrastructure planning could secure the natural gas supply to meet the demand. If the optimal solution does not exist, it will indicate that the demand could not be met under the current planning. Results are summarized in Table 5.

Table 5 Results in short-term scenarios

In S385, S360 and S340 scenarios, results show that the natural gas supply cannot meet the demand under the infrastructure planning in the China’s 13th-five-year plan. In the S330 scenario, the balance between supply and demand can be achieved, and the optimal distribution strategy can be obtained. It indicates that the natural gas demand projection is inconsistent with current infrastructure planning.

The mismatch between supply and demand reflects in a regional and monthly scale but not a national and yearly scale. The supply capacity is insufficient only in winter and in eastern regions. For example, results show that 4.2 bcm natural gas demand in East China is uncovered in the S360 scenario. In the meantime, the supply capacity in Southwest China and South China is sufficient throughout the whole year. It indicates that demand projections set by each province are not consistent with the national infrastructure planning.

Optimal planning of the natural gas infrastructure expansion

In long-term scenarios, the model could obtain the optimal planning of natural gas infrastructure expansions under different demand forecasts in 2050. The optimal planning reflects the construction timetable, including when, where, how much and which kind of infrastructure need to be constructed.

In the L3 scenario, which is the basic scenario, Figs. 7, 8 and 9 show pipelines and import facilities in 2020, 2035 and 2050 respectively. Results indicate that large quantity of pipelines need to be constructed in North China, connecting resources and demand areas, whilst new pipelines in South China need to be constructed much less.

Fig. 7
figure 7

Capacity of pipelines and LNG ports in 2020

Fig. 8
figure 8

Capacity of pipelines and LNG ports in 2035

Fig. 9
figure 9

Capacity of pipelines and LNG ports in 2050

A large number of LNG ports need to be built in most coastal provinces, making LNG a main source to increase natural gas supply before 2050. Figure 10 shows the optimal planning of import capacity expansions in different regions from 2015 to 2050. Results indicate that new LNG ports would be mainly concentrated in eastern and southern coastal provinces before 2035, and new LNG ports would be concentrated in northern coastal regions after 2035. According to the optimal strategy of shortest distance transmission, natural gas demand in East and South China needs to be supplied by more imported LNG, whilst demand in North China can be met by more pipelines.

Fig. 10
figure 10

LNG ports capacity from 2015 to 2050

Continuous expansions of storage capacity are needed to deal with seasonal fluctuations of natural gas demand and other unknown risks. Figure 11 shows the optimal storage planning of capacity expansions in different regions from 2015 to 2050. Results indicate that new storage facilities are mainly concentrated in North China to deal with heating demand in cold days. Meanwhile, policies on establishing reserves to deal with risks also have great effects on the planning. Rapid increase in storage capacity in 2020 results from those policies.

Fig. 11
figure 11

Storage capacity in different regions from 2015 to 2050

As for the impact of different demand forecasts on infrastructure planning, results show that higher demand forecasts could result in more infrastructure costs. Figure 12 shows the composition of infrastructure costs under different demand forecasts. It indicates that the impact of demand forecasts on the pipeline expansion is less than the impact on LNG ports and storage facilities. Current natural gas pipelines transport natural gas from inland areas to coastal areas. As natural gas demand increases, coastal areas would mainly meet demand by imported LNG. Therefore, the increase in natural gas demand would not greatly affect the construction of the pipeline network.

Fig. 12
figure 12

Infrastructure costs under different demand forecast

Discussion and policy suggestions

Policy suggestions are further discussed based on above analysis. First, taking market-oriented pricing mechanisms as much as possible, which reflect the relationship between supply and demand. Full market-oriented pricing can achieve the optimal distribution strategy and minimize the total supply cost. Current pricing mechanisms are not fully market-oriented, and natural gas can be divided into pipeline natural gas and LNG by source. LNG pricing fully depends on market, whilst prices of pipeline natural gas are still guided by the regulatory authority.

The difference between the actual distribution strategy and the optimal strategy mainly derives from incomplete market-oriented pricing in contracts. The optimal strategy indicates to deliver natural gas resources flexibly, rather than binding natural gas resources to fixed users all year along without considering the monthly variation. In the simulation scenario, the natural gas imported from Central Asia is transmitted to South China all the year. If market-oriented pricing is applied, which means that the highest bidder wins, the natural gas imported from Central Asia could be auctioned by users in the north, and users in south would import more LNG.

Secondly, natural gas pipelines should be centrally managed as a public resource and provides fair access to market participants. Natural gas pipelines have natural monopoly properties, and main pipelines are operated by a limited number of giant companies. This monopoly could increase the price in regions with a single natural gas supplier, because other suppliers cannot access these pipelines. It could lead to a spacial mismatch of natural gas resources and consumption compared with the optimal supply strategy. To achieve market-oriented pricing, more suppliers are required in the market to promote the competition. If all infrastructure is managed as a public resource, more suppliers would have access to the natural gas market.

Thirdly, improving coordination amongst provinces when formulating projections. Main infrastructure planning is in the national projection, which makes up the supply capacity. Province projections are formulated respectively and independently to some extent. Aggregated province projections could exceed or fall below the national projection under insufficient coordination. As shown in results, aggregated province projections exceed the national projection by 14%, which could result in a natural gas shortage by 2020. In order to avoid losses caused by deviations from the national projection, the formulation process of province projections requires uniform coordination.

Forth, infrastructure construction needs to be accelerated, especially LNG ports and storage facilities. LNG imported overseas is expected to account for a large proportion of natural gas supply in the future according to the result. Accelerating the construction of LNG ports in East China would alleviate the overall tight supply situation and reduce the risk of shortage in East China several years later. Accelerating the construction of storage facilities in North China would greatly alleviate the shortage of natural gas in winter in the short term.

Fifth, scientifically predicting natural gas demand enables better infrastructure planning. Premature or later construction of infrastructure would lead to waste and shortage respectively, which would both result in a higher overall cost.

Conclusions

In this paper, we propose a methodology to develop a monthly-scale multi-period and multi-regional optimization model for natural gas supply system planning at a transient stage. The methodology is applied to analyze China’s natural gas supply system. An optimal development strategy of natural gas distribution and infrastructure expansion is obtained by minimizing the total supply cost. Results indicate that natural gas demand forecast has great impacts on the planning. It is also pointed out that a risk of a mismatch between natural gas demand and supply infrastructure development could happen in spacial and temporal dimensions if problems at the planning stage are not properly addressed.

Policy suggestions are provided. Taking market-oriented pricing mechanisms as much as possible, which can achieve the optimal distribution strategy and minimize the total supply cost. Natural gas pipelines needs to be centrally managed as a public good and provide fair access to market participants. Coordination amongst provinces when formulating projections needs to be strengthened. Infrastructure construction needs to be accelerated, especially LNG ports in East China and storage facilities in North China. Predicting future natural gas demand scientifically enables better infrastructure planning.

Availability of data and materials

The dataset supporting the conclusions of this article is included within the article.

Abbreviations

r :

Regions in China

t :

Year, from 2015 to 2020

m :

Month, from 1 to 12

D :

Quantity of natural gas demand

DR :

Discount rate

I max :

Upper bound of natural gas import

PP :

Domestic production price

T max :

Upper bound of natural gas transmission

PI :

Import price

S max :

Upper bound of natural gas storage

PT :

Transmission price

P r :

Downstream natural gas price in region r

TAX :

Tax of importing natural gas

PR max :

Upper bound of natural gas production

PG :

Gasify price

RE :

Resources

L i :

A relatively large positive integer

pro :

Quantity of natural gas production

c :

Overall supply cost

s 0 :

Quantity of natural gas store at the beginning of a month

cp :

Production cost

s 1 :

Quantity of natural gas storage at the end of a month

ci :

Import cost

t r,rr :

Quantity of natural gas transmission from r to rr

ct :

Transmission cost

i r :

Import in region r

cs :

Store cost

e r :

Export from r

cc :

Infrastructure construction cost

NT 0 :

Standard capacity of pipelines

PNS r :

Storage facilities construction cost

NI 0 :

Standard capacity of ports

PNT r,rr :

Pipelines construction cost

NS r,t :

New storage capacity

PNI r :

LNG ports construction cost

References

  1. BP. Statistical Review of World Energy. 2018.

    Google Scholar 

  2. Moller B, Lund H. Conversion of individual natural gas to district heating: geographical studies of supply costs and consequences for the Danish energy system. Appl Energy. 2010;87(6):1846–57.

    Article  Google Scholar 

  3. Jalil-Vega F, Hawkes AD. Spatially resolved model for studying decarbonisation pathways for heat supply and infrastructure trade-offs. Appl Energy. 2018;210:1051–72.

    Article  Google Scholar 

  4. Shan XF, Wang P, Lu WZ. The reliability and availability evaluation of repairable district heating networks under changeable external conditions. Appl Energy. 2017;203:686–95.

    Article  Google Scholar 

  5. Unternaehrer J, Moret S, Joostb S, Marechal F. Spatial clustering for district heating integration in urban energy systems: application to geothermal energy. Appl Energy. 2017;190:749–63.

    Article  Google Scholar 

  6. Pan L, Liu P, Li Z. A system dynamic analysis of China's oil supply chain: over-capacity and energy security issues. Appl Energy. 2017;188:508–20.

    Article  Google Scholar 

  7. Alhamwi A, Medjroubi W, Vogt T, Agert C. GIS-based urban energy systems models and tools: introducing a model for the optimisation of flexibilisation technologies in urban areas. Appl Energy. 2017;191:1–9.

    Article  Google Scholar 

  8. Han J-H, Lee I-B. Development of a scalable infrastructure model for planning electricity generation and CO2 mitigation strategies under mandated reduction of GHG emission. Appl Energy. 2011;88(12):5056–68.

    Article  Google Scholar 

  9. Guo Z, Ma LW, Liu P, Jones I, Li Z. A multi-regional modelling and optimization approach to China's power generation and transmission planning. Energy. 2016;116:1348–59.

    Article  Google Scholar 

  10. Guo Z, Cheng R, Xu ZF, Liu P, Wang Z, Li Z, et al. A multi-region load dispatch model for the long-term optimum planning of China's electricity sector. Appl Energy. 2017;185:556–72.

    Article  Google Scholar 

  11. Ghatikar G, Mashayekh S, Stadler M, Yin R, Liu Z. Distributed energy systems integration and demand optimization for autonomous operations and electric grid transactions. Appl Energy. 2016;167:432–48.

    Article  Google Scholar 

  12. Shu K, Schneider UA, Scheffran J. Optimizing the bioenergy industry infrastructure: transportation networks and bioenergy plant locations. Appl Energy. 2017;192:247–61.

    Article  Google Scholar 

  13. Hwangbo S, Lee I-B, Han J. Mathematical model to optimize design of integrated utility supply network and future global hydrogen supply network under demand uncertainty. Appl Energy. 2017;195:257–67.

    Article  Google Scholar 

  14. Rios-Mercado RZ, Borraz-Sanchez C. Optimization problems in natural gas transportation systems: a state-of-the-art review. Appl Energy. 2015;147:536–55.

    Article  Google Scholar 

  15. Brkic D. An improvement of hardy cross method applied on looped spatial natural gas distribution networks. Appl Energy. 2009;86(7–8):1290–300.

    Article  Google Scholar 

  16. Manojlovic V, Arsenovic M, Pajovic V. Optimized Design of a gas-Distribution Pipeline Network. Appl Energy. 1994;48(3):217–24.

    Article  Google Scholar 

  17. Uester H, Dilaveroglu S. Optimization for design and operation of natural gas transmission networks. Appl Energy. 2014;133:56–69.

    Article  Google Scholar 

  18. Dieckhoener C, Lochner S, Lindenberger D. European natural gas infrastructure: the impact of market developments on gas flows and physical market integration. Appl Energy. 2013;102:994–1003.

    Article  Google Scholar 

  19. Chaudry M, Jenkins N, Qadrdan M, Wu JZ. Combined gas and electricity network expansion planning. Appl Energy. 2014;113:1171–87.

    Article  Google Scholar 

  20. Chiang N-Y, Zavala VM. Large-scale optimal control of interconnected natural gas and electrical transmission systems. Appl Energy. 2016;168:226–35.

    Article  Google Scholar 

  21. Rimkevicius S, Kaliatka A, Valincius M, Dundulis G, Janulionis R, Grybenas A, et al. Development of approach for reliability assessment of pipeline network systems. Appl Energy. 2012;94:22–33.

    Article  Google Scholar 

  22. Su H, Zhang J, Zio E, Yang N, Li X, Zhang Z. An integrated systemic method for supply reliability assessment of natural gas pipeline networks. Appl Energy. 2018;209:489–501.

    Article  Google Scholar 

  23. Lu W, Su M, Fath BD, Zhang M, Hao Y. A systematic method of evaluation of the Chinese natural gas supply security. Appl Energy. 2016;165:858–67.

    Article  Google Scholar 

  24. Zhang Q, Li Z, Wang G, Li H. Study on the impacts of natural gas supply cost on gas flow and infrastructure deployment in China. Appl Energy. 2016;162:1385–98.

    Article  Google Scholar 

  25. BP. Statistical Review of World Energy. 2017.

    Google Scholar 

  26. Aguilera RF. The role of natural gas in a low carbon Asia Pacific. Appl Energy. 2014;113:1795–800.

    Article  Google Scholar 

  27. National Bureau of Statistic of China. China energy statistical yearbook. Beijing: China statistics press; 2016.

    Google Scholar 

  28. National Development and reform commission. 2017 Gas operations profile. 2018.

    Google Scholar 

  29. National Development and reform commission. The 13th-five-year plan of energy development. 2016.

    Google Scholar 

  30. Li J, Dong X, Shangguan J, Hook M. Forecasting the growth of China's natural gas consumption. Energy. 2011;36(3):1380–5.

    Article  Google Scholar 

  31. Zeng B, Li C. Forecasting the natural gas demand in China using a self-adapting intelligent grey model. Energy. 2016;112:810–25.

    Article  Google Scholar 

  32. Shaikh F, Ji Q, Shaikh PH, Mirjat NH, Uqaili MA. Forecasting China's natural gas demand based on optimised nonlinear grey models. Energy. 2017;140:941–51.

    Article  Google Scholar 

  33. Zhang W, Yang J. Forecasting natural gas consumption in China by Bayesian model averaging. Energy Rep. 2015;1:216–20.

    Article  Google Scholar 

  34. Shaikh F, Ji Q. Forecasting natural gas demand in China: logistic modelling analysis. Int J Elec Power. 2016;77:25–32.

    Article  Google Scholar 

  35. Sinopec. Relevant information on the opening up of Sinopec Oil & Gas Pipeline Network facilities. 2017.

    Google Scholar 

  36. CNPC. Natural gas pipeline transportation costs related information. 2017.

    Google Scholar 

  37. CNOOC. Announcement on Gas Equipment Group Gas Information Disclosure. 2017.

    Google Scholar 

  38. Corporation GD. GAMS—A user’s guide. 2008.

    Google Scholar 

Download references

Acknowledgements

The authors gratefully acknowledge the support by The National Key Research and Development of China (2018YFB0604301), National Natural Science Foundation of China (71690245) and the Phase III Collaboration between BP and Tsinghua University.

Funding

The research is funded by the National Key Research and Development of China (2018YFB0604301), National Natural Science Foundation of China (71690245), and the Phase III Collaboration between BP and Tsinghua University.

Author information

Authors and Affiliations

Authors

Contributions

TL developed the mathematical model and conducted the case studies. PL developed the overall modelling and optimization framework. ZL provided insights of natural gas infrastructure expansion. All authors read and approved the final manuscript.

Corresponding author

Correspondence to Pei Liu.

Ethics declarations

Competing interests

The authors declare that they have no competing interests.

Additional information

Publisher’s Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Additional files

Additional file 1:

Import pipeline facilities in China. Location, capacity and status of import pipelines. (DOCX 13 kb)

Additional file 2:

LNG terminals in China (2017). Location, capacity and status of LNG terminals. (DOCX 14 kb)

Additional file 3:

Cross-provincial natural gas pipelines in China (2017). Location and capacity of pipelines. (DOCX 15 kb)

Additional file 4:

Underground gas storage in China (2017). Location and capacity of storage facilities. (DOCX 13 kb)

Additional file 5:

Regulated natural gas price in each province (yuan/cm). Sale prices and well prices in each province. (DOCX 13 kb)

Rights and permissions

Open Access This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The Creative Commons Public Domain Dedication waiver (http://creativecommons.org/publicdomain/zero/1.0/) applies to the data made available in this article, unless otherwise stated.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Li, T., Liu, P. & Li, Z. Modelling and optimization of a natural gas supply system at a transient stage: a case study of China. BMC Energy 1, 5 (2019). https://0-doi-org.brum.beds.ac.uk/10.1186/s42500-019-0005-6

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://0-doi-org.brum.beds.ac.uk/10.1186/s42500-019-0005-6

Keywords